Pre-Submittal Meeting Information

Home > Building Permit & Inspections > Pre-Submittal Meetings

The time to schedule a Pre-Submittal meeting is when you are ready to submit for a permit.  The Permit Control Coordinator will review the required drawings/specifications and permit application to determine if they meet the requirements needed for permit submittal. If the drawings/specifications and application meet the requirements, the application will be accepted for review.  If the drawings/specifications and application are not complete, a list of required items for the permit submittal will be provided to you.  A new appointment may be required based on the missing items.

Please refer to the Residential Submittal Requirements or the Commercial/Multi-Family Submittal Requirements for detailed information about what is required to submit for a building permit.
 

Required to Attend a Pre-Submittal Meeting prior to applying for a building permit

  • New Single Family/Multi-Family
  • Residential Additions/Alterations
  • Basement Buildouts
  • New Garage
  • Converting a Garage to Living Space
  • Commercial Projects-All
  • Kitchen & Bathroom Remodels

Exempt from Pre-Submittal Meeting


  • Express Permits
  • Multi-Family or Commercial Roofs
  • Window enlargements
  • Commercial paving projects
  • Residential drainage projects 
  • Signs
     
Please contact Mary May at (847) 359-9042 for more specific information about the Pre-Submittal Meeting
 
 

Village Hall Regular Hours: Monday - Friday: 8:00 AM - 5:00 PM
150 West Wilson Street (Temporary Location), Palatine, Illinois 60067 P. (847) 358-7500
Emergency:911 Non-Emergency: (847) 359-9000 Hours: 24 Hours
Police Headquarters 595 North Hicks Road, Palatine, Illinois 60067
© 2014 The Village of Palatine. All Rights Reserved.