The Streets Division provides a comprehensive maintenance program for streets, parkways, and sidewalks. The Village maintains 167 center lane miles of streets, as well as 246 miles of sidewalk. This team:
- Repairs potholes
- Fills cracks
- Patches pavement
- Mills and paves
- Installs and maintains signs on Village streets
- Performs:
- Street sweeping
- Pavement striping
- Shouldering
- Maintaining parkways
- Snow and ice control
The Streets Division also conducts the Leaf Collection Program in the fall and works with Engineering staff to resurface our Village streets, implement the 50/50 Sidewalk Replacement Program, and the Sidewalk Replacement Program.